Skip to content
  • Lesson 3.2
  • 7 min
  • Free
  • iPhone
  • iPad
  • Mac

Time blocking

“I’ll read tonight.” “I’ll call Tom this week.” “I’ll get to the itinerary when things calm down.”

Each of these is a B task: important, not urgent. Each has a quiet way of not happening. Nobody is waiting for it, so every day something louder takes its place.

A task without a time competes with everything

Section titled “A task without a time competes with everything”

In Lesson 1.3 you met box 2: important but not urgent. You saw that it has only one defense, which is deciding in advance when it will happen. Lesson 2.3 turned box 2 into the letter B. This lesson gives the B a place on the clock.

The idea is simple. A task on a list is a wish: it will happen if there is time. A task with a block in the schedule is an appointment: it has a time, and other things must fit around it. When a colleague asks “do you have a minute at two?”, the honest answer is now “no, I have something at two.”

Your A tasks will mostly get done anyway, because they are urgent. The block is for the B tasks, the ones that make next month better than this one.

Two habits make blocks work:

  • Size them honestly. A 90-minute task in a 30-minute block does not fit, it overflows. Estimate how long each task really takes.
  • Check the total. If the day’s tasks need eleven hours and you have eight, something is going to move. Better to choose what in the morning than to find out at six.
Dragging a task onto the schedule on iPhone
Read the transcript

An important task with no time set loses to everything urgent. So give it a block on your schedule. Touch and hold the task until it lifts, then drag it onto the schedule. A preview of the event follows your finger. Let go at the time you will do the work. The event is saved in your calendar, and the task now shows a stopwatch. Its status is Scheduled.

  1. In Daily Tasks, touch and hold a task until it lifts.
  2. Drag it onto the schedule. A preview of the event follows your finger.
  3. Drop it at the time you want to work on it.

When you drop it:

  • An event with the task’s name is saved in your calendar right away, with an alert 5 minutes before it starts.
  • The task’s status changes from Normal to Scheduled, shown by a stopwatch. This is the Scheduled status from Lesson 2.4.
  • If the task’s category is linked to a calendar, the event goes there. Lesson 3.4 shows how.

Without time estimates, the event starts half an hour before the spot where you drop it and lasts your default event length, 1 hour unless you change it.

Turn on Task Time Estimates and each task can say how long it needs. Opus One then adds up the day for you.

  • iPhone and iPad: Settings > Tasks > Task Time Estimates, then turn on Show task time estimates.
  • Mac: Preferences, Tasks tab, select Show task time estimates. Pro On Mac, the Tasks tab needs a subscription.

Give a task its estimate on the task card, in Estimated Duration. Type it the way you think it: 45, 1h or 1h30m. A task without its own estimate uses the Default task duration, 30 minutes unless you change it.

Now three things change:

  1. Each row shows its estimate, such as 45m.
  2. A dropped task’s event starts exactly where you drop it and lasts as long as the estimate.
  3. A line above the list compares the day with your tasks, for example Day 10h · Tasks 3h30m, and gives a verdict: Over-scheduled, Under-scheduled or On schedule.

Day is the time between My day starts at and My day ends at, 8:00 AM to 6:00 PM unless you change them.

Alex's example

Tuesday, 8:40. Alex has read the schedule (Lesson 3.1): product review at 11:00, lunch with Ana at 1:00, the doctor at 3:30. The As will look after themselves; the budget proposal is due today and already starts at 9:00.

The two Bs are a different story. Alex gives each one a block:

  • B1 Book the flights to Tokyo, estimate 30 minutes. Alex drops it at 12:30, so the event runs until lunch.
  • B2 Review Ana’s checkout mockups, estimate 45 minutes. Alex drops it at 2:00, straight after lunch, while Ana’s explanation is still fresh.

Both tasks now show the stopwatch. The line above the list says Under-scheduled. Alex takes off the three hours of events and the day still fits, with room for the grocery run before the pick-up.

On Sunday evening, Alex does the same thing for the week: the call with Tom about the fundraising dinner, the pricing-strategy lecture, the long run. Each gets a day and, where it matters, an hour.

Try it

  1. Find two B tasks you have been meaning to do. Put them on today or tomorrow.
  2. Turn on Task Time Estimates and give each an honest estimate.
  3. Drag each one onto the schedule at a time you will protect.
  4. Read the line above the list. If it says Over-scheduled, move something now, not at six.

Remember

  • A task without a time competes with everything else. Give your B tasks a block first.
  • Drag a task onto the schedule to book it: the event is saved and the task becomes Scheduled.
  • Estimate honestly, and remember the day budget counts tasks, not meetings.

Check yourself

Pick an answer to see whether you were right, and why.

  1. Question 1 of 4Which tasks gain the most from a block of time on the schedule?
  2. Question 2 of 4You drag a task whose status is Normal onto the schedule at 2:00. What happens?
  3. Question 3 of 4The line above your list says Under-scheduled, but you have four hours of meetings today. What should you keep in mind?
  4. Question 4 of 4Task Time Estimates is on and a task's estimate is 45 minutes. You drop it on the schedule at 2:00. How long is the event?

Finished reading? Tick it off and keep your streak going.