Break it down

Some tasks sit on your list for days. You read them every morning, feel a small weight, and pick something else.

Usually the task is not hard. It is unclear. “Plan the team offsite” has no first move, and a task without a first move loses to anything that has one.

Lesson 2.2 said a good task is small enough to do in one sitting. Some tasks are not, and that is fine: they are projects. The fix is not to try harder. It is to break the task into pieces you can start.

Ask the same question as in Lesson 5.7: what is the very next thing I can do? Then the one after that. You rarely need the whole path. Two or three visible steps are enough to get moving.

Opus One gives you three tools for this, and choosing the right one keeps things light:

Tool Use it when Example
Subtask Each step is a task in its own right, with its own day or priority Get quotes from three venues
Checklist You need a simple list of things to tick, all done at roughly the same time Oatmeal, bananas, coffee beans
Start date One piece of work takes several days Write the product descriptions, Wednesday to Friday

If a step needs a date, make it a subtask. If it only needs a tick, make it a checklist item.

Adding subtasks and a checklist on iPhone
Read the transcript

A big task often stalls because its first step is not clear. So break it down. Tap the task's name to open its card. Scroll down, and tap Add Subtasks. Tap the plus button. A new task opens, ready for its name. Type the first step, and close its card. The subtask is on the list, with its own priority and date. Tap Back. For small items that need no date of their own, tap Checklist. Tap the plus button, type the item, and tap Ok. Go back, and close the card. The subtask has its own row, and the gray counter shows how many steps are still open.

  1. Tap the task’s name to open its card.
  2. For a subtask, tap Add Subtasks, choose Daily Tasks or Master Tasks, then tap Add Subtasks and type its name.
  3. For a checklist, tap Checklist (it reads Add Checklist on a task with no items), then Add Checklist Item. Type the item and tap Ok.

A subtask in Daily Tasks gets a date; one in Master Tasks waits without one. Either way it takes the parent’s category, and its role or goal if the parent has one.

A task with subtasks or a checklist shows a gray counter at the end of its row: how many are still open. Tap or click the counter to open the list under the task and work through it without opening the card. If a task has both, Show Sublist on the card decides which one the counter opens.

Opus One also closes the loop for you:

  • Tick the last checklist item, or complete the last subtask, and the parent is completed, as long as everything else in it is done too.
  • Complete the parent and every subtask gets the same status, and every checklist item is ticked.

Some work is one piece but too long for one day. Give the task a start date. It then shows in Daily Tasks on every day from the start date to the due date, so you see it while it is under way, not only on the day it is due. Set it on the card under Start Date.

A repeating task cannot have a start date.

Alex's example

On Sunday, Alex looks at two tasks that have been sitting still.

Plan the team offsite (A1, Wednesday) becomes three subtasks:

  • B1 Pick two possible dates
  • B2 Get quotes from three venues
  • B3 Send the survey to the team

On Wednesday the row shows a counter of 3. Alex starts with the dates, which takes ten minutes. The offsite is moving.

Grocery run gets a checklist instead: oatmeal, bananas, Greek yogurt, coffee beans, chicken thighs, spinach, rice. None of these needs its own day, so subtasks would be clutter. In the store, Alex taps the counter and ticks items from the list.

And Write the product descriptions, for the online store, is two hours of work Alex wants to spread out. It gets a start date of Wednesday and a due date of Friday, so it shows each day until it is done.

Try it

  1. Find the task on your list you have been avoiding longest.
  2. Write down its next two or three steps. If a step needs its own day, add it as a subtask; if it only needs a tick, add it as a checklist item.
  3. If the work runs over several days, give it a start date.
  4. Do the first step today.

Remember

  • Big tasks stall because the first step is hidden. Make it visible.
  • Subtasks for real steps, a checklist for things to tick, a start date for work that spans days.
  • Finish the pieces and Opus One completes the whole.

Check yourself

Pick an answer to see whether you were right, and why.

  1. Question 1 of 4Why do big tasks stall?
  2. Question 2 of 4Getting quotes from three venues needs its own day and its own priority. What should it be?
  3. Question 3 of 4You tick the last open item on a task's checklist, and the task has no open subtasks. What happens?
  4. Question 4 of 4Writing 40 product descriptions will take from Wednesday to Friday. What lets one task show on all three days?