Task Time Estimates
Task Time Estimates lets you say how long each task should take. Opus One then adds up the day’s open tasks and tells you whether they fit into your working day. It is off until you turn it on.
Turn it on
Section titled “Turn it on”- Open Settings > Tasks > Task Time Estimates.
- Turn on Show task time estimates.
- Check Default task duration, My day starts at and My day ends at.
- Open Settings > Tasks > Task Time Estimates.
- Turn on Show task time estimates.
- Check Default task duration, My day starts at and My day ends at.
- Open Preferences and click the Tasks tab.
- Select Show task time estimates.
- Check Default task duration, My day starts at and My day ends at.
| Setting | What it does | Default |
|---|---|---|
| Default task duration | The estimate of a task that has none of its own | 30 minutes |
| My day starts at | The start of your working day | 8:00 AM |
| My day ends at | The end of your working day | 6:00 PM |
The end of your day must come after its start. Otherwise Opus One shows The end of your day must be after its start. and keeps the old times.
The same screen holds the setting for automatic calendar events. See Calendar events from tasks.
Give a task an estimate
Section titled “Give a task an estimate”- Open the task card: tap the task’s name.
- Tap Estimated Duration.
- Type the time and tap Ok.
- Open the task card: tap the task’s name.
- Tap the value next to Estimated Duration.
- Type the time and tap Ok.
- Open the task card: double-click the task.
- Type the time in the Estimated Duration field.
Type the time the way you like: 45, 45m, 1h, 1h30m, 1 hour 30 minutes or 1.5h. A number alone means minutes. Leave the field empty to use the default again. Text without a number is ignored.
A value in gray is not the task’s own: it is the default, or the total of the task’s open subtasks.
The duration badge
Section titled “The duration badge”With estimates on, each task in Daily Tasks and Master Tasks shows its estimate at the end of the row, such as 30m or 1h15m. Subtasks do not show a badge.
Does the day fit?
Section titled “Does the day fit?”Above the Daily Tasks list, a summary compares your day with your tasks, for example Day 10h · Tasks 3h30m, followed by a verdict:
| Verdict | Meaning |
|---|---|
| Over-scheduled (red) | The open tasks need more time than your day has |
| Under-scheduled (green) | Time is left over |
| On schedule (gray) | Tasks and day match, within 5 minutes |
Day is the time between My day starts at and My day ends at. Tasks adds up the open tasks of the day. Finished tasks are left out, and a subtask is not counted again when its parent is listed.
Above the Master Tasks list, Total task time adds up all open Master Tasks. It has no verdict.
Good to know
Section titled “Good to know”- On Mac, these settings are on the Tasks tab of Preferences, which appears only with a subscription. See What is free and what is Pro.
- A task without its own estimate uses the total of its open subtasks. With no open subtasks, it uses the default.
- When you finish a task that used the default, its estimate is kept, so changing the default later does not rewrite past days.
- All occurrences of a repeating task share one estimate.
- Calendar events are not subtracted from your day. Only tasks count.
- Dragging a task onto the schedule creates an event as long as the task’s estimate. See Drag and drop.
- With estimates on, moving a start date past the due date pushes the due date by the estimate. See Start, due and completed dates.